Corridor access
How corridor access fees are determined:
- Project works, major works, and minor works are as defined by the National Code of Practice for Utility Operators’ Access to Transport Corridors.
- The Council may at its discretion allow for multiple sites to be included in a single CAR application with a single fee being charged. Applicants shall, if they consider there is a case to combine multiple sites, provide the Council with the justification for a combined application fee.
- Possible examples where a single fee may be considered are as follows:
- repetitive works of a minor nature requiring minimal or no excavation works,
- minor works on multiple sites (maximum of four to five minor streets); and
- main contractor managing multiple works but located on a single site.
| Corridor access |
2026/27 Fee |
| Corridor access request (CAR) fee project works (7 hours) |
$1,330 |
| Corridor access request (CAR) fee major works (3 hours) |
$570 |
| Corridor access request (CAR) fee minor works (1 hour) |
$190 |
| Inspection fee per hour |
$190 |
Paper road closure
| Paper road closure |
2026/27 Fee |
| Road stopping application fee |
$948 |
| Hourly rate for additional work per hour |
$190 |
Vehicle Crossing Permit
| Vehicle Crossing Permit |
2026/27 Fee |
| A permit is required to construct a new vehicle crossing from a residential or commercial building to the legal road or to upgrade an existing vehicle crossing. |
$570 |
Overweight Load Permit
| Overweight Load Permit |
2026/27 Fee |
Overweight loads permit fee: To cover vetting and issuing a permit for [an] overweight load[s] or specialist vehicles using local roads and that starts or finishes its journey in Kāpiti Coast District** Minimum charge based on 30 minutes. Processing time will be invoiced based on hourly engineering fee* (minimum charge $95) |
$190 |
*When a full technical bridge assessment is required this could take one to two working days and will be invoiced per hour.
**For SH1 permits, apply to New Zealand Transport Agency direct.
Removal of overhanging trees/vegetation
| Removal of overhanging trees/vegetation – on road reserve (Section 355 Local Government Act 1974) |
2026/27 Fee |
| Removal of trees, vegetation or obstructions to prevent injury, obstruction to traffic, pedestrians and general infrastructure, per hour charge |
$190 |