Building consent fees
Last updated: 1 July 2024
Applicants are required to pay the full fee for the consent at the time of application.
Under some conditions, applicants may be required to pay additional fees when processing is completed. This will include fees for development levies, additional inspections, re-assessment, alternative design/details, and other fees required under the Building Act 2004.
The inspection fee is estimated on the number of inspections required for the type of work. If the number of inspections has been over-estimated a refund will be made. If additional inspections are required, they will be charged at the rate applicable at the time they occurred and will need to be paid before we issue a code compliance certificate. The building consent fee includes inspection fees only where shown for minor works.
The fees exclude BRANZ, MBIE, and accreditation levies, and refundable deposits which are scheduled in the ‘other fees’ section and are additional to the building consent fees.
The building consent fees in the following table include the plan vetting and digital storage charges and costs associated with scanning hard copy applications or alternatively paying application costs for electronic applications received through the portal. The building consent fees (other than minor works) include the fee for provision of electronic copy of a building consent.
Minor work
(This includes one or two inspections as indicated. Additional inspections will be charged at $179 per hour.)
Minor work |
2024/25 Fee |
Solid fuel heater (includes one inspection) |
$300 |
Solid fuel heater with wetback (includes two inspections) |
$433 |
Solar water heating (includes one inspection) |
$290 |
Minor building work <$5,000 (includes one inspection) eg, sheds |
$356 |
Minor building work < $10,000: retaining walls/carports decks/swimming/spa pools/ conservatories/ pergolas/ plumbing and drainage (includes two inspections) |
$890 |
Processing of residential building consents
Processing of residential building consents |
2024/25 Fee |
Residential new building /alterations: $10,001–$20,000 |
$861 |
Residential new building /alterations: $20,001–$50,000 |
$1,216 |
Residential new building /alterations: $50,001–$100,000 |
$1,566 |
Residential new building /alterations: $100,001–$250,000 |
$1,922 |
Residential new building /alterations: $250,001–$500,000 |
$2,278 |
Residential new building /alterations: $500,001 upwards |
$2,278 |
Processing of commercial/industrial consents
*The inspection fee includes inspection onsite, travel, creating inspection records and review of documentation in office. If the project is in a remote area or has difficult access, additional travel time will be charged at the additional hours charge rate. The inspection fee also applies to meetings prior to Code Compliance Certificate (CCC) issue.
Project information memorandum (PIM) fees
Applicants are required to pay the full fee for the PIM at the time of application.
Residential new dwellings |
2024/25 Fee |
PIM – Simple Residential (fee simple title) |
$510 |
PIM – Multi-residential and commercial (cross lease and unit titled) |
$891 |
Multi-proof consent fees
Applicants are required to pay the full fee for the consent at the time of application.
Under some conditions you may be required to pay additional fees when processing is completed. This will include fees for development levies, additional inspections and other fees required under the Building Act 2004.
If the number of inspections has been over-estimated, a refund will be made.
The multi-proof consent fees below include a digital storage charge of $54.
The fees exclude BRANZ, MBIE levies (these are not set by the Council) and refundable deposits.
Multi-proof consents | 2024/25 Fee |
Multi-proof consent (includes three hours' processing) |
$854 |
Building consent fees – other charges
BRANZ and MBIE levies are not set by the council. They apply to all work valued at $20,000 or more.
Other charges | 2024/25 Fee |
Registration of Section 77(1) certificate |
$269 |
Digital storage charge |
$54 per application |
Amendment to building consent application |
$274 |
Application for discretionary exemption (Schedule 1, Part 1, Section 2, Building Act 2004) |
$274 |
Warrant of fitness audit inspections |
$179 per hour |
Inspection fees associated with a notice to fix |
$179 per hour |
Engineering technical assessment/peer review |
Cost plus 10% |
New/amended compliance schedule (part of a building consent or initiated by an Independently qualified person IQP) |
$167 |
Building consent fees – other charges continued
Other charges | 2024/25 Fee |
Application for Code Compliance Certificate |
$91 |
Certificate of public use |
$374 |
Application for certificate of acceptance |
$747 |
The building consent fee does not include the cost of any structural engineer assessment which may be required. Go Council and GoGet are not set by the Council, collecting on behalf. |
|
Land information memorandum (LIM) |
$367 |
Land information memorandum (LIM) with building plans |
$387 |
Record of title |
$41 |
Reassessment fee (amended plans/further information received) |
$179 |
Alternative design/details applications |
$179 |
Environmental health/plan vetting |
$179 |
GoCouncil building consent online application fee (SIMPLI) |
$51.75 |
GoGet building consent processing fee |
$114.70 per application |
2024/25 Fee |
|
Compliance Inspection fee |
$179 |
Administration fee |
$119 |
Non-cancellation inspection charge (less than 24 hours’ notice) |
$179 fixed fee |
Infrastructure deposit
An infrastructure deposit will be taken for each significant new build including pile driving, building relocation, drainage works, earthworks for building platforms, concrete pours and new vehicle crossing to ensure that Council’s assets in the road reserve are protected, and that if damaged, can be repaired. If no damage is found during inspection and/or the damage has been repaired satisfactorily, the deposit will be refunded.
An infrastructure inspection fee will be taken for each significant new build including pile driving, building relocation, drainage works, earthworks for building platforms, concrete pours and new vehicle crossing. This fee includes a pre-construction onsite inspection and/or documentation review, a post construction onsite inspection and certification.
If the works require further inspections, additional time will be charged as per the hourly inspection fee.
Other charges | 2024/25 Fee |
Infrastructure inspection fee |
$179 |
Hourly infrastructure inspection fee |
$179 |
Where both a new build and a new vehicle crossing are in the same application, only one infrastructure inspection fee will be charged. |
|
a) The deposit where no new vehicle crossing is included |
$698 |
b) The deposit where a new vehicle crossing is required to provide access from a residential building to the legal road |
$1,862 |
c) The deposit where a new commercial vehicle crossing is required to provide access from a commercial building to the legal road |
$2,026 |
Provision of building files, copy of building consents, copy of compliance schedules or aerial maps via email, or on USB. Disbursements additional.
|
$119 |
Access to building files/all copying/printing charges additional to the above services: |
Other charges |
2024/25 Fee |
Printing charges - Black and white A4 per page (first 20 pages free) |
$0.30 |
Printing charges - Black and white A3 per page |
$0.40 |
Printing charges - Colour A4 per page |
$2.70 |
Printing charges - Colour A3 per page |
$4.20 |
Building certificate for supply and sale of alcohol |
$179 |
Customer complaint compliance investigation |
$179 |
Non-cancellation building consent inspection charge (less than 24 hours’ notice) |
$179 |
Other charges |
2024/25 Fee |
Building warrant of fitness renewal (one-two systems) |
$90 |
Building warrant of fitness renewal (three plus systems) |
$134 |
Non-cancellation building warrant of fitness inspection charge (less than 24 hours’ notice) |
$179 |
Removal of Section 72 certificate |
$179 |
Removal of Section 77(1) certificate |
$179 |
Time extension fee (for consents about to lapse or 24 months after issue) |
$113 |
List of building consents issued each week (emailed) |
$100 |
List of building consents issued each month (emailed) |
$50 |
List of building consents issued each month (posted) |
$78 |
Receiving third party reports or other information to place on a property file at the owner’s request |
$119 |
Application for exemption from the requirement to carry out seismic work on the building or part |
$274 |
Other charges |
2024/25 Fee |
Application for extension of time to complete seismic work for heritage building |
$274 |
Application for extension of time to provide seismic assessment |
$274 |
District plan check fee all applications (except minor) |
2024/25 Fee |
Building consents with a project value < $20,000 |
$89 |
Building consents with a project value > $20,001 |
$358 |
Other charges |
2024/25 Fee |
Easement – new/changes/cancellations (Landowner approval/Non Regulatory) |
$895 |
Land Status change (or type, or similar) |
$895 Application Fee |
Additional External costs associated with Easement process or Land Status change |
At Cost |