Victor Weggery Reserve playground revamp
We've revamped some of Victor Weggery Reserve playground in the 2023/24 financial year.
Some equipment in the playground had reached the end of its safe life and has been replaced.
New equipment includes:
- tower with tube slide and climbing features
- climbing
- junior slide (to be part of existing junior module).
Latest news
22 March 2024 – the upgraded equipment is now open! Enjoy this updated space.
Image: New junior slide (part of the existing junior module). Larger image. [JPG 6.23 MB]
Image: New climbing module. Larger image [JPG 6.19 MB].
Image: New junior slide from another angle. Larger image [JPG 5.55 MB].
Image: New tower with tube slide and climbing features. Larger image. [PNG 671 KB]
Image: The new climbing frame from the top of the tower. Larger image. [PNG 732 KB]
Updated 22 March 2024